• Cleared out old cabinets, faux bricks and flooring
  • Removed stairwell box
  • Added more support to the floor
  • Built out the new stairwell area with wall and base cabinet profile for additional counter space.
  • Patched, primed and painted
  • Installed cabinets and countertop
  • Replaced outlets and switches
  • Tile the backsplash
  • Build a shelf in the base to the left of the fridge and tile it
  • Replace the ceiling light fixture
  • Install new windows